Timestamp
2023-10-02 00:00:00 UTC  
Forecast For
2023-10-03 0100 UTC  
Category
 
  • FORCE WRF forecasts
    • UK Domain
      • Domain 1
        • 2m_dewpoint_depression
        • Maximum CAPE (J/Kg)
        • Equivalent Potential Temperature (K)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Upward heatflux at the surface (Wm⁻²)
        • Lifted condensation level (m)
        • Level of free convection (m)
        • Total outgoing long-wave radiation (Wm¯²)
        • ppt
        • pwa
        • Cloud water mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Graupel mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Ice mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Rain water mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Snow mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Water vapor mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Reflectivity (dBZ)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Relative Humidity (%)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Skew-T
          • Alderney
          • BarkstonHeath
          • BelfastCity
          • BelfastIntl
          • Benbecula
          • Benson
          • BigginHill
          • Birmingham
          • Blackbushe
          • Blackpool
          • BoscombeDown
          • Bournemouth
          • Bristol
          • BristolFilton
          • BrizeNorton
          • Brough
          • Cambridge
          • Cardiff
          • Carlisle
          • Chalgrove
          • Chivenor
          • ChurchFenton
          • City
          • CityofDerry
          • Coningsby
          • Conington
          • Cosford
          • Cottesmore
          • Coventry
          • Cranfield
          • Cranwell
          • Culdrose
          • Dishforth
          • Dundee
          • DurhamTValley
          • Dyce
          • Edinburgh
          • Exeter
          • Fairford
          • Farnborough
          • Gamston
          • Gatwick
          • Glasgow
          • Guernsey
          • Haverfordwest
          • Hawarden
          • Heathrow
          • Honington
          • Humberside
          • Inverness
          • IsleOfMan
          • Jersey
          • Kemble
          • Kidlington
          • Kirkwall
          • Lakenheath
          • Lasham
          • LeedsBradford
          • Leeming
          • Leicester
          • Leuchars
          • LintonOnOuse
          • Liverpool
          • Llanbedr
          • Lossiemouth
          • Luton
          • Lyneham
          • Manchester
          • Manston
          • Marham
          • Mildenhall
          • Newcastle
          • NorthWeald
          • Northolt
          • Norwich
          • NottmEMids
          • Odiham
          • Plymouth
          • Prestwick
          • Scampton
          • Scatsta
          • Shawbury
          • SheffieldCity
          • Shoreham
          • Southampton
          • Southend
          • StAngelo
          • StAthan
          • StMawgan
          • Stansted
          • Stornoway
          • Sumburgh
          • Swansea
          • Ternhill
          • Topcliffe
          • Turweston
          • Waddington
          • WalneyIsland
          • Warton
          • Wattisham
          • Wick
          • Wittering
          • Woodvale
          • Yeovilton
        • Sea level pressure (hPa) 2m temperature (°C)
        • Potential Temperature (θ) (K)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • cloud_fraction
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Cross sections
          • CrosssectionA
            • crosssectionlocation
          • CrosssectionB
            • crosssectionlocation
          • CrosssectionC
            • crosssectionlocation
          • CrosssectionD
            • crosssectionlocation
          • KeplertoChilbolton
            • crosssectionlocation
          • WardonHilltoChilbolton
            • crosssectionlocation
          • WardonHilltoKepler
            • crosssectionlocation
          • Blen_SN
            • crosssectionlocation
          • Blen_WE
            • crosssectionlocation
          • FSC_SN
            • crosssectionlocation
          • FSC_WE
            • crosssectionlocation
        • Map plots
          • FullDomain
          • p300_FullDomain
          • p500_FullDomain
          • p700_FullDomain
          • p850_FullDomain
          • p925_FullDomain
          • p200_FullDomain
          • 2 m dewpoint depression
            • 2mdewpointdepression
          • 2 m dewpoint temperature
            • 2mdewpointtemperature
          • 2 m temperature
            • 2mtemperature
          • CAPE ratio (unfiltered)
            • CAPEratio
          • Absolute vorticity (levels)
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
            • p200
          • CAPE (levels)
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • CIN (levels)
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Cloud Fractions (low, med, high)
            • cloudfraction
          • Cloud and maximum reflectivity
            • cloudmaxreflectivity
          • Clouds and 1hr precipitation
            • cloudprecipitation
          • Clouds and reflectivity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Dewpoint temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Equivalent potential temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Mean sea level pressure and fronts
            • fax
          • 200 hPa jetstream
            • jetstreams
          • LFC
            • leveloffreeconvection
          • LCL
            • liftingcondensationlevel
          • Maximum CAPE (lowest 3000 m)
            • maxCAPE
          • Mean sea level pressure
            • mslp
          • Omega (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Potential temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Potential vorticity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Precipitable water
            • precipitablewater
          • Radiation fog
            • radiationfog
          • Relative humidity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Specific humidity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Wet bulb temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Wind speed (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • 10mwindspeed
            • 10mwindspeed
      • Domain 2
        • 2m_dewpoint_depression
        • Maximum CAPE (J/Kg)
        • Equivalent Potential Temperature (K)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Upward heatflux at the surface (Wm⁻²)
        • Lifted condensation level (m)
        • Level of free convection (m)
        • Total outgoing long-wave radiation (Wm¯²)
        • ppt
        • pwa
        • Cloud water mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Graupel mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Ice mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Rain water mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Snow mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Water vapor mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Reflectivity (dBZ)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Relative Humidity (%)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Skew-T
          • Alderney
          • BarkstonHeath
          • BelfastCity
          • BelfastIntl
          • Benbecula
          • Benson
          • BigginHill
          • Birmingham
          • Blackbushe
          • Blackpool
          • BoscombeDown
          • Bournemouth
          • Bristol
          • BristolFilton
          • BrizeNorton
          • Brough
          • Cambridge
          • Cardiff
          • Carlisle
          • Chalgrove
          • Chivenor
          • ChurchFenton
          • City
          • CityofDerry
          • Coningsby
          • Conington
          • Cosford
          • Cottesmore
          • Coventry
          • Cranfield
          • Cranwell
          • Culdrose
          • Dishforth
          • Dundee
          • DurhamTValley
          • Dyce
          • Edinburgh
          • Exeter
          • Fairford
          • Farnborough
          • Gamston
          • Gatwick
          • Glasgow
          • Guernsey
          • Haverfordwest
          • Hawarden
          • Heathrow
          • Honington
          • Humberside
          • Inverness
          • IsleOfMan
          • Kemble
          • Kidlington
          • Kirkwall
          • Lakenheath
          • Lasham
          • LeedsBradford
          • Leeming
          • Leicester
          • Leuchars
          • LintonOnOuse
          • Liverpool
          • Llanbedr
          • Lossiemouth
          • Luton
          • Lyneham
          • Manchester
          • Manston
          • Marham
          • Mildenhall
          • Newcastle
          • NorthWeald
          • Northolt
          • Norwich
          • NottmEMids
          • Odiham
          • Plymouth
          • Prestwick
          • Scampton
          • Shawbury
          • SheffieldCity
          • Shoreham
          • Southampton
          • Southend
          • StAngelo
          • StAthan
          • StMawgan
          • Stansted
          • Stornoway
          • Sumburgh
          • Swansea
          • Ternhill
          • Topcliffe
          • Turweston
          • Waddington
          • WalneyIsland
          • Warton
          • Wattisham
          • Wick
          • Wittering
          • Woodvale
          • Yeovilton
          • Jersey
        • Sea level pressure (hPa) 2m temperature (°C)
        • Potential Temperature (θ) (K)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • cloud_fraction
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Cross sections
          • 06-00-00_CrosssectionA
          • 07-00-00_CrosssectionA
          • 08-00-00_CrosssectionA
          • 09-00-00_CrosssectionA
          • 10-00-00_CrosssectionA
          • 11-00-00_CrosssectionA
          • 12-00-00_CrosssectionA
          • 13-00-00_CrosssectionA
          • 14-00-00_CrosssectionA
          • 15-00-00_CrosssectionA
          • 16-00-00_CrosssectionA
          • 17-00-00_CrosssectionA
          • 18-00-00_CrosssectionA
          • 19-00-00_CrosssectionA
          • 20-00-00_CrosssectionA
          • 21-00-00_CrosssectionA
          • 22-00-00_CrosssectionA
          • 23-00-00_CrosssectionA
          • 00-00-00_CrosssectionA
          • 01-00-00_CrosssectionA
          • 02-00-00_CrosssectionA
          • 03-00-00_CrosssectionA
          • 04-00-00_CrosssectionA
          • 05-00-00_CrosssectionA
          • CrosssectionA
            • Absolute vorticity (levels)
            • Dewpoint temperature (levels)
            • Equivalent potential temperature (levels)
            • Omega (levels)
            • Potential temperature (levels)
            • Reflectivity (dBZ)
            • Relative humidity (levels)
            • Specific humidity (levels)
            • Temperature (levels)
            • wetbulbpotentialtemperature
            • Wet bulb temperature (levels)
            • wetbulbtemperaturedepression
            • crosssectionlocation
          • CrosssectionB
            • crosssectionlocation
            • absolutevorticity
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
          • CrosssectionC
            • crosssectionlocation
            • absolutevorticity
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
          • CrosssectionD
            • crosssectionlocation
            • absolutevorticity
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
          • KeplertoChilbolton
            • crosssectionlocation
          • WardonHilltoChilbolton
            • crosssectionlocation
            • absolutevorticity
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
          • WardonHilltoKepler
            • crosssectionlocation
            • absolutevorticity
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
          • Blen_SN
            • crosssectionlocation
          • Blen_WE
            • crosssectionlocation
          • FSC_SN
            • crosssectionlocation
          • FSC_WE
            • crosssectionlocation
        • Map plots
          • FullDomain
          • p300_FullDomain
          • p500_FullDomain
          • p700_FullDomain
          • p850_FullDomain
          • p925_FullDomain
          • p200_FullDomain
          • 2 m dewpoint depression
            • 2mdewpointdepression
          • 2 m dewpoint temperature
            • 2mdewpointtemperature
          • 2 m temperature
            • 2mtemperature
          • CAPE ratio (unfiltered)
            • CAPEratio
          • Absolute vorticity (levels)
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
            • p200
          • CAPE (levels)
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • CIN (levels)
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Cloud Fractions (low, med, high)
            • cloudfraction
          • Cloud and maximum reflectivity
            • cloudmaxreflectivity
          • Clouds and 1hr precipitation
            • cloudprecipitation
          • Clouds and reflectivity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Dewpoint temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Equivalent potential temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • 200 hPa jetstream
            • jetstreams
          • LFC
            • leveloffreeconvection
          • LCL
            • liftingcondensationlevel
          • Maximum CAPE (lowest 3000 m)
            • maxCAPE
          • Mean sea level pressure
            • mslp
          • Omega (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Potential temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Potential vorticity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Precipitable water
            • precipitablewater
          • Radiation fog
            • radiationfog
          • Relative humidity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Specific humidity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Wet bulb temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Wind speed (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • 10mwindspeed
            • 10mwindspeed
        • profiles
          • Alderney
            • skewT
            • profilelocation
          • BarkstonHeath
            • skewT
            • profilelocation
          • BelfastCity
            • skewT
            • profilelocation
          • BelfastIntl
            • skewT
            • profilelocation
          • Benbecula
            • skewT
            • profilelocation
          • Benson
            • skewT
            • profilelocation
          • BigginHill
            • skewT
            • profilelocation
          • Birmingham
            • skewT
            • profilelocation
          • Blackbushe
            • skewT
            • profilelocation
          • Blackpool
            • skewT
            • profilelocation
          • BoscombeDown
            • skewT
            • profilelocation
          • Bournemouth
            • skewT
            • profilelocation
          • BreachHillVedette
            • skewT
            • profilelocation
          • Bristol
            • skewT
            • profilelocation
          • BristolFilton
            • skewT
            • profilelocation
          • BrizeNorton
            • skewT
            • profilelocation
          • Brough
            • skewT
            • profilelocation
          • Cambridge
            • skewT
            • profilelocation
          • Cardiff
            • skewT
            • profilelocation
          • Carlisle
            • skewT
            • profilelocation
          • Chalgrove
            • skewT
            • profilelocation
          • Chilbolton
            • skewT
            • profilelocation
          • Chivenor
            • skewT
            • profilelocation
          • ChurchFenton
            • skewT
            • profilelocation
          • City
            • skewT
            • profilelocation
          • CityofDerry
            • skewT
            • profilelocation
          • Coningsby
            • skewT
            • profilelocation
          • Conington
            • skewT
            • profilelocation
          • Cosford
            • skewT
            • profilelocation
          • Cottesmore
            • skewT
            • profilelocation
          • Coventry
            • skewT
            • profilelocation
          • Cranfield
            • skewT
            • profilelocation
          • Cranwell
            • skewT
            • profilelocation
          • Culdrose
            • skewT
            • profilelocation
          • Dishforth
            • skewT
            • profilelocation
          • Dundee
            • skewT
            • profilelocation
          • DurhamTValley
            • skewT
            • profilelocation
          • Dyce
            • skewT
            • profilelocation
          • Edinburgh
            • skewT
            • profilelocation
          • Exeter
            • skewT
            • profilelocation
          • Fairford
            • skewT
            • profilelocation
          • Farnborough
            • skewT
            • profilelocation
          • Gamston
            • skewT
            • profilelocation
          • Gatwick
            • skewT
            • profilelocation
          • Glasgow
            • skewT
            • profilelocation
          • Guernsey
            • skewT
            • profilelocation
          • Haverfordwest
            • skewT
            • profilelocation
          • Hawarden
            • skewT
            • profilelocation
          • Heathrow
            • skewT
            • profilelocation
          • HenstridgeAirport
            • skewT
            • profilelocation
          • Heytesbury
            • skewT
            • profilelocation
          • Honington
            • skewT
            • profilelocation
          • Humberside
            • skewT
            • profilelocation
          • Inverness
            • skewT
            • profilelocation
          • IsleOfMan
            • skewT
            • profilelocation
          • Jersey
            • skewT
          • Kemble
            • skewT
            • profilelocation
          • Kidlington
            • skewT
            • profilelocation
          • Kirkwall
            • skewT
            • profilelocation
          • Lakenheath
            • skewT
            • profilelocation
          • Larkhill
            • skewT
            • profilelocation
          • Lasham
            • skewT
            • profilelocation
          • LeedsBradford
            • skewT
            • profilelocation
          • Leeming
            • skewT
            • profilelocation
          • Leicester
            • skewT
            • profilelocation
          • Leuchars
            • skewT
            • profilelocation
          • LintonOnOuse
            • skewT
            • profilelocation
          • Liverpool
            • skewT
            • profilelocation
          • Llanbedr
            • skewT
            • profilelocation
          • Lossiemouth
            • skewT
            • profilelocation
          • Luton
            • skewT
            • profilelocation
          • Lyneham
            • skewT
            • profilelocation
          • Manchester
            • skewT
            • profilelocation
          • Manston
            • skewT
            • profilelocation
          • Marham
            • skewT
            • profilelocation
          • Mildenhall
            • skewT
            • profilelocation
          • Netheravon
            • skewT
            • profilelocation
          • Newcastle
            • skewT
            • profilelocation
          • NorthWeald
            • skewT
            • profilelocation
          • Northolt
            • skewT
            • profilelocation
          • Norwich
            • skewT
            • profilelocation
          • NottmEMids
            • skewT
            • profilelocation
          • Odiham
            • skewT
            • profilelocation
          • Plymouth
            • skewT
            • profilelocation
          • PortonDown
            • skewT
            • profilelocation
          • Prestwick
            • skewT
            • profilelocation
          • Reading
            • skewT
            • profilelocation
          • RedhornVedette
            • skewT
            • profilelocation
          • Scampton
            • skewT
            • profilelocation
          • Scatsta
            • skewT
          • Shawbury
            • skewT
            • profilelocation
          • SheffieldCity
            • skewT
            • profilelocation
          • Shoreham
            • skewT
            • profilelocation
          • Southampton
            • skewT
            • profilelocation
          • Southend
            • skewT
            • profilelocation
          • SpireViewAirstrip
            • skewT
            • profilelocation
          • StAngeloEnniskillen
            • skewT
            • profilelocation
          • StAthan
            • skewT
            • profilelocation
          • StMawgan
            • skewT
            • profilelocation
          • Stansted
            • skewT
            • profilelocation
          • StokehillFarm
            • skewT
            • profilelocation
          • Stornoway
            • skewT
            • profilelocation
          • Sumburgh
            • skewT
            • profilelocation
          • Swansea
            • skewT
            • profilelocation
          • Ternhill
            • skewT
            • profilelocation
          • Thruxton
            • skewT
            • profilelocation
          • Topcliffe
            • skewT
            • profilelocation
          • Turweston
            • skewT
            • profilelocation
          • UoLWestSondeSite
            • skewT
            • profilelocation
          • Waddington
            • skewT
            • profilelocation
          • WalneyIsland
            • skewT
            • profilelocation
          • WardonHill
            • skewT
            • profilelocation
          • Warton
            • skewT
            • profilelocation
          • Wattisham
            • skewT
            • profilelocation
          • Wick
            • skewT
            • profilelocation
          • Wittering
            • skewT
            • profilelocation
          • Woodvale
            • skewT
            • profilelocation
          • YatesburyField
            • skewT
            • profilelocation
          • Yeovilton
            • skewT
            • profilelocation
          • CapelDewi
            • skewT
            • profilelocation
          • BTTower_AMOF
            • skewT
            • profilelocation
          • Brighton_AMOF
            • skewT
            • profilelocation
          • CapelDewi_AMOF
            • skewT
            • profilelocation
          • LeedsFarm_AMOF
            • skewT
            • profilelocation
          • PenleePoint_AMOF
            • skewT
            • profilelocation
          • Weybourne_AMOF
            • skewT
            • profilelocation
          • Blencathra
            • profilelocation
            • skewT
          • Blencathrafieldcentre
            • profilelocation
            • skewT
          • Blencathrafieldcentre
            • profilelocation
          • Blencathrasummit
            • profilelocation
            • profilelocation
            • skewT
          • Penrith
            • profilelocation
            • skewT
            • skewT
          • Penrith
            • profilelocation
          • Keswick
            • profilelocation
            • skewT
          • CARES_50N_11W
            • skewT
          • CARES_Cork
            • profilelocation
            • skewT
          • Lewisham
            • profilelocation
            • skewT
          • LURA_launchsite
            • profilelocation
            • skewT
          • DaleFort
            • profilelocation
            • skewT
        • timelines
          • 00-00-00_Leeds
          • 00-00-00_DaleFort
          • 00-00-00_Hawarden
      • Domain 3
        • 2m_dewpoint_depression
        • Maximum CAPE (J/Kg)
        • Equivalent Potential Temperature (K)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Upward heatflux at the surface (Wm⁻²)
        • Lifted condensation level (m)
        • Level of free convection (m)
        • Total outgoing long-wave radiation (Wm¯²)
        • ppt
        • pwa
        • Cloud water mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Graupel mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Ice mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Rain water mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Snow mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Water vapor mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Reflectivity (dBZ)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Relative Humidity (%)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Skew-T
          • Benson
          • BoscombeDown
          • Bournemouth
          • Bristol
          • BristolFilton
          • BrizeNorton
          • Cardiff
          • Chalgrove
          • Chivenor
          • Culdrose
          • Exeter
          • Fairford
          • Haverfordwest
          • Kemble
          • Kidlington
          • Lasham
          • Lyneham
          • Plymouth
          • Southampton
          • StAthan
          • StMawgan
          • Swansea
          • Yeovilton
        • Sea level pressure (hPa) 2m temperature (°C)
        • Potential Temperature (θ) (K)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • crosssections
          • CrosssectionA
            • absolutevorticity
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
            • crosssectionlocation
          • CrosssectionB
            • absolutevorticity
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
            • crosssectionlocation
          • CrosssectionC
            • absolutevorticity
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
            • crosssectionlocation
          • CrosssectionD
            • absolutevorticity
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
            • crosssectionlocation
          • KeplertoChilbolton
            • absolutevorticity
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
            • crosssectionlocation
          • WardonHilltoChilbolton
            • absolutevorticity
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
            • crosssectionlocation
          • WardonHilltoKepler
            • absolutevorticity
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
            • crosssectionlocation
          • Blen_SN
            • crosssectionlocation
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
            • windspeed
          • Blen_WE
            • crosssectionlocation
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
            • windspeed
          • FSC_SN
            • crosssectionlocation
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
            • windspeed
          • FSC_WE
            • crosssectionlocation
            • dewpointtemperature
            • equivalentpotentialtemperature
            • omega
            • potentialtemperature
            • reflectivity
            • relativehumidity
            • specifichumidity
            • temperature
            • wetbulbpotentialtemperature
            • wetbulbtemperature
            • wetbulbtemperaturedepression
            • windspeed
        • maps
          • 2mdewpointdepression
            • 2mdewpointdepression
          • 2mdewpointtemperature
            • 2mdewpointtemperature
          • 2mtemperature
            • 2mtemperature
          • CAPEratio
            • CAPEratio
          • absolutevorticity
            • p300
            • p500
            • p700
            • p850
            • p925
            • p200
          • cape3d
            • p700
            • p850
            • p925
          • cin3d
            • p700
            • p850
            • p925
          • cloudfraction
            • cloudfraction
          • cloudmaxreflectivity
            • cloudmaxreflectivity
          • cloudprecipitation
            • cloudprecipitation
          • cloudreflectivity
            • p200
            • p300
            • p500
            • p700
            • p850
            • p925
          • dewpointtemperature
            • p200
            • p300
            • p500
            • p700
            • p850
            • p925
          • equivalentpotentialtemperature
            • p200
            • p300
            • p500
            • p700
            • p850
            • p925
          • jetstreams
            • jetstreams
          • leveloffreeconvection
            • leveloffreeconvection
          • liftingcondensationlevel
            • liftingcondensationlevel
          • maxCAPE
            • maxCAPE
          • mslp
            • mslp
          • omega
            • p200
            • p300
            • p500
            • p700
            • p850
            • p925
          • potentialtemperature
            • p200
            • p300
            • p500
            • p700
            • p850
            • p925
          • potentialvorticity
            • p200
            • p300
            • p500
            • p700
            • p850
            • p925
          • precipitablewater
            • precipitablewater
          • radiationfog
            • radiationfog
          • relativehumidity
            • p200
            • p300
            • p500
            • p700
            • p850
            • p925
          • specifichumidity
            • p200
            • p300
            • p500
            • p700
            • p850
            • p925
          • temperature
            • p200
            • p300
            • p500
            • p700
            • p850
            • p925
          • wetbulbtemperature
            • p200
            • p300
            • p500
            • p700
            • p850
            • p925
          • windspeed
            • p200
            • p300
            • p500
            • p700
            • p850
            • p925
          • tracerlml
            • tracerlml
          • 10mwindspeed
            • 10mwindspeed
        • profiles
          • BreachHillVedette
            • skewT
          • Chilbolton
            • skewT
          • HenstridgeAirport
            • skewT
          • Heytesbury
            • skewT
          • Larkhill
            • skewT
          • Netheravon
            • skewT
          • PortonDown
            • skewT
          • Reading
            • skewT
          • RedhornVedette
            • skewT
          • SpireViewAirstrip
            • skewT
          • StokehillFarm
            • skewT
          • Thruxton
            • skewT
          • UoLWestSondeSite
            • skewT
          • WardonHill
            • skewT
          • YatesburyField
            • skewT
          • Blencathra
            • skewT
          • Blencathrafieldcentre
            • profilelocation
            • skewT
            • skewT
          • Blencathrafieldcentre
            • profilelocation
          • Blencathrasummit
            • profilelocation
            • skewT
            • skewT
          • Blencathrasummit
            • profilelocation
          • Penrith
            • profilelocation
            • skewT
            • skewT
          • Penrith
            • profilelocation
          • Keswick
            • profilelocation
            • skewT
    • Cabo Verde Domain
      • Domain 1
        • 2m_dewpoint_depression
        • Maximum CAPE (J/Kg)
        • Equivalent Potential Temperature (K)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Upward heatflux at the surface (Wm⁻²)
        • Lifted condensation level (m)
        • Level of free convection (m)
        • Total outgoing long-wave radiation (Wm¯²)
        • ppt
        • pwa
        • Cloud water mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Graupel mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Ice mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Rain water mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Snow mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Water vapor mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Reflectivity (dBZ)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Relative Humidity (%)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Skew-T
          • Praia
        • Sea level pressure (hPa) 2m temperature (°C)
        • Potential Temperature (θ) (K)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • cloud_fraction
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Cross sections
          • CrosssectionA
            • crosssectionlocation
          • CrosssectionB
            • crosssectionlocation
        • Map plots
          • FullDomain
          • p300_FullDomain
          • p500_FullDomain
          • p700_FullDomain
          • p850_FullDomain
          • p925_FullDomain
          • p200_FullDomain
          • Wind speed (levels)
            • 700 hPa
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 850 hPa
            • 925 hPa
          • 2 m dewpoint depression
            • 2mdewpointdepression
          • 2 m dewpoint temperature
            • 2mdewpointtemperature
          • 2 m temperature
            • 2mtemperature
          • CAPE ratio (unfiltered)
            • CAPEratio
          • Absolute vorticity (levels)
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
            • p200
          • CAPE (levels)
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • CIN (levels)
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Cloud Fractions (low, med, high)
            • cloudfraction
          • Cloud and maximum reflectivity
            • cloudmaxreflectivity
          • Clouds and 1hr precipitation
            • cloudprecipitation
          • Clouds and reflectivity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Dewpoint temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Equivalent potential temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Mean sea level pressure and fronts
            • fax
          • 200 hPa jetstream
            • jetstreams
          • LFC
            • leveloffreeconvection
          • LCL
            • liftingcondensationlevel
          • Maximum CAPE (lowest 3000 m)
            • maxCAPE
          • Mean sea level pressure
            • mslp
          • Omega (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Potential temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Potential vorticity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Precipitable water
            • precipitablewater
          • Radiation fog
            • radiationfog
          • Relative humidity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Specific humidity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Wet bulb temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
      • Domain 2
        • 2m_dewpoint_depression
        • Maximum CAPE (J/Kg)
        • Equivalent Potential Temperature (K)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Upward heatflux at the surface (Wm⁻²)
        • Lifted condensation level (m)
        • Level of free convection (m)
        • Total outgoing long-wave radiation (Wm¯²)
        • ppt
        • pwa
        • Cloud water mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Graupel mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Ice mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Rain water mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Snow mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Water vapor mixing ratio (g kg¯¹)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Reflectivity (dBZ)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Relative Humidity (%)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Skew-T
          • Praia
        • Sea level pressure (hPa) 2m temperature (°C)
        • Potential Temperature (θ) (K)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • cloud_fraction
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
        • Cross sections
          • 06-00-00_CrosssectionB
          • 07-00-00_CrosssectionB
          • 08-00-00_CrosssectionB
          • 09-00-00_CrosssectionB
          • 10-00-00_CrosssectionB
          • 11-00-00_CrosssectionB
          • 12-00-00_CrosssectionB
          • 13-00-00_CrosssectionB
          • 14-00-00_CrosssectionB
          • 15-00-00_CrosssectionB
          • 16-00-00_CrosssectionB
          • 17-00-00_CrosssectionB
          • 18-00-00_CrosssectionB
          • 19-00-00_CrosssectionB
          • 20-00-00_CrosssectionB
          • 21-00-00_CrosssectionB
          • 22-00-00_CrosssectionB
          • 23-00-00_CrosssectionB
          • 00-00-00_CrosssectionB
          • 01-00-00_CrosssectionB
          • 02-00-00_CrosssectionB
          • 03-00-00_CrosssectionB
          • 04-00-00_CrosssectionB
          • 05-00-00_CrosssectionB
          • CrosssectionA
            • crosssectionlocation
          • CrosssectionB
            • Absolute vorticity (levels)
            • Dewpoint temperature (levels)
            • Equivalent potential temperature (levels)
            • Omega (levels)
            • Potential temperature (levels)
            • Reflectivity (dBZ)
            • Relative humidity (levels)
            • Specific humidity (levels)
            • Temperature (levels)
            • wetbulbpotentialtemperature
            • Wet bulb temperature (levels)
            • wetbulbtemperaturedepression
            • crosssectionlocation
        • Map plots
          • FullDomain
          • p300_FullDomain
          • p500_FullDomain
          • p700_FullDomain
          • p850_FullDomain
          • p925_FullDomain
          • p200_FullDomain
          • 2 m dewpoint depression
            • 2mdewpointdepression
          • 2 m dewpoint temperature
            • 2mdewpointtemperature
          • 2 m temperature
            • 2mtemperature
          • CAPE ratio (unfiltered)
            • CAPEratio
          • Absolute vorticity (levels)
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
            • p200
          • CAPE (levels)
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • CIN (levels)
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Cloud Fractions (low, med, high)
            • cloudfraction
          • Cloud and maximum reflectivity
            • cloudmaxreflectivity
          • Clouds and 1hr precipitation
            • cloudprecipitation
          • Clouds and reflectivity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Dewpoint temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Equivalent potential temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • 200 hPa jetstream
            • jetstreams
          • LFC
            • leveloffreeconvection
          • LCL
            • liftingcondensationlevel
          • Maximum CAPE (lowest 3000 m)
            • maxCAPE
          • Mean sea level pressure
            • mslp
          • Omega (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Potential temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Potential vorticity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Precipitable water
            • precipitablewater
          • Radiation fog
            • radiationfog
          • Relative humidity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Specific humidity (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Wet bulb temperature (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
          • Wind speed (levels)
            • 200 hPa
            • 300 hPa
            • 500 hPa
            • 700 hPa
            • 850 hPa
            • 925 hPa
        • profiles
          • Praia
            • skewT
            • profilelocation
        • timelines
          • 00-00-00_Praia
  • Iceland Domain
    • Domain 1
      • 2m_dewpoint_depression
      • Maximum CAPE (J/Kg)
      • Equivalent Potential Temperature (K)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Upward heatflux at the surface (Wm⁻²)
      • Lifted condensation level (m)
      • Level of free convection (m)
      • Total outgoing long-wave radiation (Wm¯²)
      • ppt
      • pwa
      • Cloud water mixing ratio (g kg¯¹)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Graupel mixing ratio (g kg¯¹)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Ice mixing ratio (g kg¯¹)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Rain water mixing ratio (g kg¯¹)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Snow mixing ratio (g kg¯¹)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Water vapor mixing ratio (g kg¯¹)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Reflectivity (dBZ)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Relative Humidity (%)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Skew-T
        • %c3%8dsafj%c3%b6r%c3%b0ur
        • %c3%93lafsv%c3%adk
        • Akranes
        • Akureyri
        • B%c3%a1r%c3%b0arbunga
        • Borgarnes
        • Dalv%c3%adk
        • Egilssta%c3%b0ir
        • Eyjafjallaj%c3%b6kull
        • Fagradalsfjall
        • Gr%c3%admsv%c3%b6tn
        • H%c3%b6fn
        • H%c3%basav%c3%adk
        • Hafnarfj%c3%b6r%c3%b0ur
        • Hekla
        • Holuhraun
        • Hverager%c3%b0i
        • K%c3%b3pavogur
        • Neskaupsta%c3%b0ur
        • Rey%c3%b0arfj%c3%b6r%c3%b0ur
        • Reykjanesb%c3%a6r
        • Reykjav%c3%adk
        • Sau%c3%b0%c3%a1rkr%c3%b3kur
        • Selfoss
        • Stykkish%c3%b3lmur
        • Vestmannaeyjar
      • Sea level pressure (hPa) 2m temperature (°C)
      • Potential Temperature (θ) (K)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • cloud_fraction
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Cross sections
        • CrosssectionA
          • crosssectionlocation
        • CrosssectionB
          • crosssectionlocation
        • CrosssectionC
          • crosssectionlocation
      • Map plots
        • FullDomain
        • p300_FullDomain
        • p500_FullDomain
        • p700_FullDomain
        • p850_FullDomain
        • p925_FullDomain
        • p200_FullDomain
        • 2 m dewpoint depression
          • 2mdewpointdepression
        • 2 m dewpoint temperature
          • 2mdewpointtemperature
        • 2 m temperature
          • 2mtemperature
        • CAPE ratio (unfiltered)
          • CAPEratio
        • Absolute vorticity (levels)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • CAPE (levels)
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • CIN (levels)
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Cloud Fractions (low, med, high)
          • cloudfraction
        • Cloud and maximum reflectivity
          • cloudmaxreflectivity
        • Clouds and 1hr precipitation
          • cloudprecipitation
        • Clouds and reflectivity (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Dewpoint temperature (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Equivalent potential temperature (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Mean sea level pressure and fronts
          • fax
        • 200 hPa jetstream
          • jetstreams
        • LFC
          • leveloffreeconvection
        • LCL
          • liftingcondensationlevel
        • Maximum CAPE (lowest 3000 m)
          • maxCAPE
        • Mean sea level pressure
          • mslp
        • Omega (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Potential temperature (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Potential vorticity (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Precipitable water
          • precipitablewater
        • Radiation fog
          • radiationfog
        • Relative humidity (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Specific humidity (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Temperature (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Wet bulb temperature (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Wind speed (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
    • Domain 2
      • 2m_dewpoint_depression
      • Maximum CAPE (J/Kg)
      • Equivalent Potential Temperature (K)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Upward heatflux at the surface (Wm⁻²)
      • Lifted condensation level (m)
      • Level of free convection (m)
      • Total outgoing long-wave radiation (Wm¯²)
      • ppt
      • pwa
      • Cloud water mixing ratio (g kg¯¹)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Graupel mixing ratio (g kg¯¹)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Ice mixing ratio (g kg¯¹)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Rain water mixing ratio (g kg¯¹)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Snow mixing ratio (g kg¯¹)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Water vapor mixing ratio (g kg¯¹)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Reflectivity (dBZ)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Relative Humidity (%)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Skew-T
        • %c3%8dsafj%c3%b6r%c3%b0ur
        • %c3%93lafsv%c3%adk
        • Akranes
        • Akureyri
        • B%c3%a1r%c3%b0arbunga
        • Borgarnes
        • Dalv%c3%adk
        • Egilssta%c3%b0ir
        • Eyjafjallaj%c3%b6kull
        • Fagradalsfjall
        • Gr%c3%admsv%c3%b6tn
        • H%c3%b6fn
        • H%c3%basav%c3%adk
        • Hafnarfj%c3%b6r%c3%b0ur
        • Hekla
        • Holuhraun
        • Hverager%c3%b0i
        • K%c3%b3pavogur
        • Neskaupsta%c3%b0ur
        • Rey%c3%b0arfj%c3%b6r%c3%b0ur
        • Reykjanesb%c3%a6r
        • Reykjav%c3%adk
        • Sau%c3%b0%c3%a1rkr%c3%b3kur
        • Selfoss
        • Stykkish%c3%b3lmur
        • Vestmannaeyjar
      • Sea level pressure (hPa) 2m temperature (°C)
      • Potential Temperature (θ) (K)
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • cloud_fraction
        • 300 hPa
        • 500 hPa
        • 700 hPa
        • 850 hPa
      • Cross sections
        • 06-00-00_CrosssectionA
        • 07-00-00_CrosssectionA
        • 08-00-00_CrosssectionA
        • 09-00-00_CrosssectionA
        • 10-00-00_CrosssectionA
        • 11-00-00_CrosssectionA
        • 12-00-00_CrosssectionA
        • 13-00-00_CrosssectionA
        • 14-00-00_CrosssectionA
        • 15-00-00_CrosssectionA
        • 16-00-00_CrosssectionA
        • 17-00-00_CrosssectionA
        • 18-00-00_CrosssectionA
        • 19-00-00_CrosssectionA
        • 20-00-00_CrosssectionA
        • 21-00-00_CrosssectionA
        • 22-00-00_CrosssectionA
        • 23-00-00_CrosssectionA
        • 00-00-00_CrosssectionA
        • 01-00-00_CrosssectionA
        • 02-00-00_CrosssectionA
        • 03-00-00_CrosssectionA
        • 04-00-00_CrosssectionA
        • 05-00-00_CrosssectionA
        • 06-00-00_CrosssectionC
        • 07-00-00_CrosssectionC
        • 08-00-00_CrosssectionC
        • 09-00-00_CrosssectionC
        • 10-00-00_CrosssectionC
        • 11-00-00_CrosssectionC
        • 12-00-00_CrosssectionC
        • 13-00-00_CrosssectionC
        • 14-00-00_CrosssectionC
        • 15-00-00_CrosssectionC
        • 16-00-00_CrosssectionC
        • 17-00-00_CrosssectionC
        • 18-00-00_CrosssectionC
        • 19-00-00_CrosssectionC
        • 20-00-00_CrosssectionC
        • 21-00-00_CrosssectionC
        • 22-00-00_CrosssectionC
        • 23-00-00_CrosssectionC
        • 00-00-00_CrosssectionC
        • 01-00-00_CrosssectionC
        • 02-00-00_CrosssectionC
        • 03-00-00_CrosssectionC
        • 04-00-00_CrosssectionC
        • 05-00-00_CrosssectionC
        • CrosssectionA
          • Absolute vorticity (levels)
          • Dewpoint temperature (levels)
          • Equivalent potential temperature (levels)
          • Omega (levels)
          • Potential temperature (levels)
          • Reflectivity (dBZ)
          • Relative humidity (levels)
          • Specific humidity (levels)
          • Temperature (levels)
          • wetbulbpotentialtemperature
          • Wet bulb temperature (levels)
          • wetbulbtemperaturedepression
          • crosssectionlocation
        • CrosssectionB
          • crosssectionlocation
        • CrosssectionC
          • Absolute vorticity (levels)
          • Dewpoint temperature (levels)
          • Equivalent potential temperature (levels)
          • Omega (levels)
          • Potential temperature (levels)
          • Reflectivity (dBZ)
          • Relative humidity (levels)
          • Specific humidity (levels)
          • Temperature (levels)
          • wetbulbpotentialtemperature
          • Wet bulb temperature (levels)
          • wetbulbtemperaturedepression
          • crosssectionlocation
      • Map plots
        • FullDomain
        • p300_FullDomain
        • p500_FullDomain
        • p700_FullDomain
        • p850_FullDomain
        • p925_FullDomain
        • p200_FullDomain
        • 2 m dewpoint depression
          • 2mdewpointdepression
        • 2 m dewpoint temperature
          • 2mdewpointtemperature
        • 2 m temperature
          • 2mtemperature
        • CAPE ratio (unfiltered)
          • CAPEratio
        • Absolute vorticity (levels)
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • CAPE (levels)
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • CIN (levels)
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Cloud Fractions (low, med, high)
          • cloudfraction
        • Cloud and maximum reflectivity
          • cloudmaxreflectivity
        • Clouds and 1hr precipitation
          • cloudprecipitation
        • Clouds and reflectivity (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Dewpoint temperature (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Equivalent potential temperature (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • 200 hPa jetstream
          • jetstreams
        • LFC
          • leveloffreeconvection
        • LCL
          • liftingcondensationlevel
        • Maximum CAPE (lowest 3000 m)
          • maxCAPE
        • Mean sea level pressure
          • mslp
        • Omega (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Potential temperature (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Potential vorticity (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Precipitable water
          • precipitablewater
        • Radiation fog
          • radiationfog
        • Relative humidity (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Specific humidity (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Temperature (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Wet bulb temperature (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
        • Wind speed (levels)
          • 200 hPa
          • 300 hPa
          • 500 hPa
          • 700 hPa
          • 850 hPa
          • 925 hPa
      • profiles
        • %c3%8dsafj%c3%b6r%c3%b0ur
          • skewT
          • profilelocation
        • %c3%93lafsv%c3%adk
          • skewT
          • profilelocation
        • Akranes
          • skewT
          • profilelocation
        • Akureyri
          • skewT
          • profilelocation
        • Borgarnes
          • skewT
          • profilelocation
        • Dalv%c3%adk
          • skewT
          • profilelocation
        • Egilssta%c3%b0ir
          • skewT
          • profilelocation
        • Eyjafjallaj%c3%b6kull
          • skewT
          • profilelocation
        • Fagradalsfjall
          • skewT
          • profilelocation
        • H%c3%b6fn
          • skewT
          • profilelocation
        • H%c3%basav%c3%adk
          • skewT
          • profilelocation
        • Hafnarfj%c3%b6r%c3%b0ur
          • skewT
          • profilelocation
        • Hekla
          • skewT
          • profilelocation
        • Holuhraun
          • skewT
          • profilelocation
        • Hverager%c3%b0i
          • skewT
          • profilelocation
        • K%c3%b3pavogur
          • skewT
          • profilelocation
        • Neskaupsta%c3%b0ur
          • skewT
          • profilelocation
        • Rey%c3%b0arfj%c3%b6r%c3%b0ur
          • skewT
          • profilelocation
        • Reykjanesb%c3%a6r
          • skewT
          • profilelocation
        • Reykjav%c3%adk
          • skewT
          • profilelocation
        • Sau%c3%b0%c3%a1rkr%c3%b3kur
          • skewT
          • profilelocation
        • Selfoss
          • skewT
          • profilelocation
        • Stykkish%c3%b3lmur
          • skewT
          • profilelocation
        • Vestmannaeyjar
          • skewT
          • profilelocation
        • Gr%c3%admsv%c3%b6tn
          • skewT
          • profilelocation
        • B%c3%a1r%c3%b0arbunga
          • profilelocation
        • Bárðarbunga
          • profilelocation
        • Dalvík
          • profilelocation
          • skewT
        • Egilsstaðir
          • profilelocation
          • skewT
        • Eyjafjallajökull
          • profilelocation
          • skewT
        • Grímsvötn
          • profilelocation
          • skewT
        • Hafnarfjörður
          • profilelocation
          • skewT
        • Hveragerði
          • profilelocation
          • skewT
        • Höfn
          • profilelocation
          • skewT
        • Húsavík
          • profilelocation
          • skewT
        • Kópavogur
          • profilelocation
          • skewT
        • Neskaupstaður
          • profilelocation
          • skewT
        • Ísafjörður
          • profilelocation
          • skewT
        • Ólafsvík
          • profilelocation
          • skewT
        • Reyðarfjörður
          • profilelocation
          • skewT
        • Reykjanesbær
          • profilelocation
          • skewT
        • Reykjavík
          • profilelocation
          • skewT
        • Sauðárkrókur
          • profilelocation
          • skewT
        • Stykkishólmur
          • profilelocation
          • skewT

omega_d01_2023-10-03_01-00-00_p200_FullDomain

[small JPEG][medium JPEG]